  What problems should be paid attention  when installing wer chandelier?

  The illumination of wer chandelier always affects the quality and safety of workers’ work and a series of operational issues, so the installation of wer chandelier must be strictly in accordance with "Power Quality Public Grid Harmonics", "Lamp Standard GB7000.1" and "LED Lighting Products" Standards require design and production. Light selection or installation must consider the actual lighting conditions of the construction site, such as the age of the workers, the different installation heights, the weather, and other facrs. Let’s take a closer look at the problems that should be paid attention  when installing the wer crane lighting. Which parts.

  1. Requirements for LED lamps

  1. Construction site lighting consumes a lot of electricity and needs  be energy-saving, and it must be used with good energy-saving effects;

  2. The lamp body is made of high-strength aluminum material, with anti-aging surface treatment, self-cleaning, explosion-proof, and strong corrosion resistance. Because it is exposed  the outdoor sun and rain for a long time, the protection level must reach IP65 or above;

  3. The product configuration light source, power supply, reflecr, etc. must be of high quality, which is more conducive  ensuring the brightness and life of the product and reducing the maintenance rate.

  ,

  2. Lighting arrangement of LED wer chandelier

  In the layout, it is necessary  fully consider the coverage area of ??the LED wer chandelier, meet the principles of structural construction height, and facilitate the installation and maintenance of the LED wer chandelier, and select the LED lights and cables in the construction area.

  1. The model of LED wer chandelier should be selected according  the illuminance of the construction site;

  2. The entire site construction site must be considered  meet the requirements of safe construction;

  3. It is necessary  comprehensively consider the installation and removal of the wer crane lamp. When the lamp is installed and removed, avoid damage  the LED wer crane lamp cable.

  damage;

  4. Reasonably configure the cable model  prevent the cable cross section from being unsatisfacry or exceeding the usage amount and causing waste.

  3. LED wer chandelier installation

  1. Install the LED light: Fix the base of the LED light with a Ф12 screw  the hand and foot board.

  2. Install an LED light starter on one side of the light stand, and make a rain cover.

  3. Install the lampshade: Tighten the base support rod and the lampshade with matching bolts  adjust the lighting direction and rainproof angle of the lampshade.

  4. There is a special lighting control box control under the wer crane, each switch controls a light, and the control box is protected by bamboo plastic board  protect the control box from falling objects when the wer crane rises;

  5. The LED lamp holder and ballast shell are reliably connected  the protective neutral line.

  The last thing is the maintenance of the LED wer crane lamps. It is necessary  control the LED lighting time and the extinguishing time, and make a running record  prevent the premature turning on or the steady light, which will cause waste of electricity.