Language

News

Make the gardens more beautiful & make the world brighter!

outdoor solar garden light

time:2021-07-07 source:ZJ Lighting Views:183


  What should be paid attention  when installing the luminaire  effectively ensure the landing of the lighting design plan?

  The first is the p of the building. A narrow beam spotlight is installed  wash the p of the vertical wall. After the initial node is provided  the curtain wall, the curtain wall replied that lamps cannot be installed above the vertical wall because the vertical wall may be deformed and rainwater may cause damage. Entering in the interior, it will corrode. The picture below shows the initial node (facade node).

  So they considered installing the lamps on both sides of the vertical wall. After communicating with the curtain wall unit, they agreed  this method, but they needed  add a long angle steel behind the aluminum plate  prevent the fixed lamps from deforming. At this time, a new problem appeared. , The lamps were originally used as rectangular lamps. Now that the installation method is changed, most of the lamps will be shining on the aluminum plate and glass of the building facade due  light distribution. Therefore, the lamps must be re-selected. (Designers must be familiar with Lamps, especially narrow-beam light distribution lamps) then feed back the nodes  the curtain wall. They deepen the nodes and praise their rigorous and serious style of work. At the same time, they also provide the necessary drawings and documents for the work addition declaration. See below.

  Here I would like  give the owner’s electrical person a compliment. He hopes that the pipeline on the p is hidden, so he invited the construction unit  have a meeting with us. (At that time, the roof of the building was about  be poured. Before that, the pipeline should be laid in cooperation with the site, but it was not there yet. Construction bidding, the time was missed after the bidding), the picture below is a pho of the on-site construction at that time.

  The picture below is a pho of completion of construction

  At the corners of the building facade, the lamps are installed up and down  strengthen the outline of the building. The power of the lamps used is 30W (except for the corner positions, the power of the p lamps is 10W). The following figure shows the installation of lamps below.

  The picture below is a pho of the installation of the p light (the same type of light was used in the original design, but the price of the light above is higher, so the construction unit proposed  replace this light below, after consulting the opinion of Party A, agreed with the construction unit Change of lights is required, but it still looks a bit obvious during the day)

  One more detail.

  The effect after lighting (the power of the lamp on the p is 10W, which is brighter than expected)

  The other node is on the underside of the building. Let's take a pho of the scene first. This is a daytime pho, and no lamps can be seen from outside.

  Let's have another lighting effect, now you find the lamps!

  The picture below is the curtain wall picture obtained during the design. At that time, there was no structure  conceal the installation of lamps. The whole project has many structures like this, and the width of the surface is different. After considering the above facrs, the 36W/m linear wash was finally selected. Wall lights.

  The figure below is the drawing of the lighting node funding (at that time this node was funding the curtain wall, but this node is also related  the structure. The curtain wall unit asked me  find the construction unit, so I went  the construction unit  communicate, and the construction unit asked me  find the curtain wall again. Finally, after communicating with Party A, the curtain wall unit will cooperate and deepen it. Therefore, after we complete the node capital withdrawal, we must implement it. Don't think that the drawing will be finished after the drawing is handed over. Many majors are often irrelevant. It may be that he did not fully realize it, otherwise there will be mutual excuses later, and one more point, as long as there is a structure reserved, it is best not  be done by the construction unit, otherwise you will understand)

  Later, the curtain wall unit was deepened, see the picture below

  At that time, I didn’t pay o much attention  the lack of dimensioning on it. Previously, there was dimensioning in the drawing. Later, when I arrived at the site, I found that the uniformity of the lighting was much worse, and it didn’t feel right. I asked the workers  measure the dimensions and found The height was 5cm less. After I came back, I quickly measured the deepening of the curtain wall, only  find that it was really less. Later, I communicated with the curtain wall and replied that the structure is not beautiful when it is large, and it is not easy  fix it with the two screws above. Therefore, the size of the node graph must be marked, if it is really uncertain, it must be described in words.

  The raised node is 200cm, which is already the smallest size. (Previously, a lot of research and experiments have been done on the installation of light troughs. Different sizes, different lamps, different installation methods, and different materials will all affect the achieved effect, especially Now that the design of no main lights is popular in the interior, this problem is even more serious. The scary thing is that many friends don’t feel it at all. Friends with better aesthetics have changed from liking  disliking it, mainly because the off effect is not comfortable) Now It is 150cm, part of the light is blocked, and the workers are also more laborious  install, but fortunately, Party A did not have any trouble~~~

  There are two aspects of this node that have not been considered thoroughly. One is that the illuminated surface is dark gray aluminum plate (the previous plan was the same light gray as the facade aluminum plate, so if you are not sure about the material or color when raising funds, you must mark it. , Otherwise there will be uncontrollable problems of one kind or another), the brightness and uniformity will be greatly affected; another problem is that the light emitting surface will be seen from the interior, which is slightly uncomfortable. If it is a hotel or residential space, it must be Avoid this situation! The picture below is taken from an indoor angle.

  Summary: If you want  do one thing well, don't ignore any detail! Have time  learn more!

  Shenzhen  Lighting is a lamp manufacturer focusing on R&D and production of LED landscape lighting and outdoor lighting. It has 9 years of experience in military industry lighting services. It is located in Shenzhen Baoan. Its products cover: stadium lighting, LED sports lighting, stadium lights, LED stadium lights, High bay lights, high bay lights manufacturers, LED workshop lights, workshop LED lights, tunnel LED lights, LED tunnel lights, LED wer chandeliers, street lights, LED workshop lights, LED squares, lamps, LED lights, high pole lights, wer chandelier, LED Street lights, LED lamps, LED high pole lights, etc. For many years, our company has always put product quality in the first place. At present, the company has passed the ISO9001 international quality certification system, and the products have passed CE, ROHS, 3C and other domestic and international certifications and inspections. We insist on making cusmers feel free  buy and use LED lights. Philosophy and mission,  Lighting [Chongde Shangshan is the source of the original] look forward  cooperating with you for a win-win situation!